Skip over navigation

Package Details

Back to Packages

Click here to download the prequalification form

Package # CS0014
Goods/General
Bid Closing Date December-07-18
Title Shotcrete / Concrete Batch Plant (Permanent Facility) EOI Posting Date October-18-16
Tender Issue Date November-09-18 EOI Closing Date ** CLOSED **
Status Awarded Last Revised On March-25-19
Successful Bidder BMH Systems Inc.

Contract Scope

<p style="margin: 0px"><em><span style='margin: 0px; font-family: "Arial",sans-serif;'><font size="3">Design, build, supply, test and commission a complete modularized Shotcrete/Concrete Plant (SCP).<span style="margin: 0px">  </span>Vendor shall operate plant for minimum of 2 years during construction phase, then operations shall be transferred to owner. Plant will be a packaged set of equipment for batching and shall be designed as a central mix plant. Supply of batch plant to site, as well as on site Construction, operation, maintenance and delivery of concrete to worksite - To be used for supply of concrete and shotcrete for both construction and underground mining development. </font></span></em></p> <p style="margin: 0px"><em><span style='margin: 0px; font-family: "Arial",sans-serif;'><font size="3">Shotcrete Production Requirements are:</font></span></em></p> <p style="margin: 0px"><em><span style='margin: 0px; font-family: "Arial",sans-serif;'><font size="3"><span style="margin: 0px"> </span>4 - 5 m3 load size;</font></span></em></p> <p style="margin: 0px"><em><span style='margin: 0px; font-family: "Arial",sans-serif;'><font size="3"><span style="margin: 0px"> </span>10 – 60 m3 / 24 hour period</font></span></em></p> <p style="margin: 0px"><em><span style='margin: 0px; font-family: "Arial",sans-serif;'><font size="3"><span style="margin: 0px"> </span>2,000 – 22,000 m3 / year. </font></span></em></p> <p style="margin: 0px"><em><span style='margin: 0px; font-family: "Arial",sans-serif;'><font size="3">Concrete Production Requirements are:</font></span></em></p> <p style="margin: 0px"><em><span style='margin: 0px; font-family: "Arial",sans-serif;'><font size="3"><span style="margin: 0px"> </span>6 – 10 m3 load size;</font></span></em></p> <p style="margin: 0px"><em><span style='margin: 0px; font-family: "Arial",sans-serif;'><font size="3"><span style="margin: 0px"> </span>50 – 750 m3 / 24 hour period</font></span></em></p> <p style="margin: 0px"><em><span style='margin: 0px; font-family: "Arial",sans-serif;'><font size="3"><span style="margin: 0px"> </span>12,500 - 14,000 m3 / year.</font></span></em></p> <p style="margin: 0px"><em><span style='margin: 0px; font-family: "Arial",sans-serif;'><font size="3">INSTALLATION BY OTHERS</font></span></em><span style='margin: 0px; font-family: "Arial",sans-serif;'></span></p>