Contract Scope

SAG and Ball Mill Lubrication Improvements

Install high-pressure pumps and delivery systems including filtering

Install Nitrogen Accumulators

Demolition of existing industrial equipment

Install associated electrical and instrumentation

 Concentrator Glycol Heating System Upgrades

Install isolation valves and replace heaters on an existing glycol heat distribution system

Cyclone Pump Feed Box

Remove and replace existing corroded structural steel members

Concentrator Fresh Water Piping Replacement

Remove and replace approximately 300m of existing freshwater distribution piping with stainless steel

Larox Filter Press High Pressure Air Lines Replacement

Remove and replace high pressure air lines for three (3) Larox units

SAG Mill Feed Chute Replacement

Supply and Install new ore feed chute including liners

Concentrate Thickeners Repairs

Remove and Replace existing thickener tank walls and overflow launders

Apply new protective coating to thickener